Wiring Specs

Click a link below to download our specs for service loops. Please contact the Cooperative with any questions.
Note: Any three-phase service larger than 800 AMP requires engineering approval. Please coordinate with the Co-op by calling 888-788-1551. 

Submeter Installation 

400A-800A 3-Phase

400A-600A 1-Phase

400A-600A 1-Phase w/Switch

Underground Service

Meter Panel

Approved Meter Sockets

Cogeneration Installation